Concrete

Work out the concrete volume for a slab or footing and the bags of pre-mix.

m
m
cm
%
Volume (with waste)2.10 m³
Net volume2.00 m³
Bags117

Bag yield varies by product (e.g. 40kg ≈ 0.018 m³).

Breakdown

Net volume2.00 m³
Waste0.10 m³
Total2.10 m³
Bags117

How it works

Calculate the concrete volume needed for slabs, foundations and other rectangular projects, including an estimate of bags.

Frequently asked questions

How is concrete volume calculated?

For a rectangular project, multiply length, width and depth.

How many bags are needed?

The number depends on each bag yield and is rounded up.

Should I allow extra?

Yes, a small allowance covers waste and uneven surfaces.